Developing the carbon capture future

EDF is the leader in thermal generation, engineering and digitalized operation and maintenance.

EDF to lead decarbonization efforts with first-of-their-kind decarbonized CCGT power plants in KSA

EDF, Al Jomaih Energy and Water Co. Ltd. (JENWA), and Buhur for Investment Company have signed Power Purchase Agreements with The Saudi Power Procurement Company (SPPC) for decarbonized Combined Cycle Gas Turbine (CCGT) projects in Saudi Arabia; Taiba-2 and Qassim-2, each with a capacity of 1.8 GW. These projects are pivotal in Saudi Arabia's energy mix plan, aiming for net-zero greenhouse gases by 2060. EDF will take the lead in the decarbonization and carbon capture efforts, ensuring a reliable energy supply for approximately three million residential units annually while boosting the local economy.

Saudi electricity company optimization center

Saudi Arabia’s Generation Optimization Center

EDF is building and operating two supervision and optimization centers for Saudi Electricity Company’s (SEC) generation fleet (42,000MW) in the Kingdom of Saudi Arabia.

At EDF we bring our expertise in several areas: O&M, Asset Management, fuel logistics, call program, industrial architecture and eMonitoring continuously since 2016. EDF teams are integrated into SEC teams to work in harmony within the Generation Optimization Center business unit.

EDF team supports SEC employees in their skills development and implementation of a centralized knowledge pool.

renewable energy: open-cycle gas turbines plant

AWEER…Dubai’s open-cycle gas turbines plant

EDF is the Owner’s engineer and is managing on behalf of our client DEWA, the H Station Phase 4 project – Aweer, which consists in the construction of 3 open cycle gas turbines for a global capacity of 700MW.

EDF services consist in developing the feasibility study of the project, preparing the EPC tender documents, evaluating the EPC bids and performing the complete supervision of the EPC contractor from the design review till the warranty period.

Lekhwair CCGT plant in Oman

Support Services for Lekhwair CCGT plant in Oman

Our services are bringing EDF Ingeum’s expertise in engineering and commissioning management to Zawawi Powertech Engineering, a local EPC company, especially for the construction of a new 100MW combined cycle power plant in Lekhwair. Furthermore, EDF Ingeum has accomplished a complete digital modelization plan of the plant in order to monitor its performance depending on the onsite conditions and the sustainable operation over the years. This wide portfolio of services is provided by the joint venture between EDF and the local Zawawi group, called EDF Zawawi Energy Services LLC.

SUR gas engines power plant commissioning in Oman

EDF is bringing its expertise in commissioning management to the local EPC company, Zawawi Powertech Engineering, for the construction of a new 200MW gas engines power plant in SUR for Oman LNG. The services are provided through the local joint venture EDF - Zawawi Energy Services LLC. EDF has prepared pre-commissioning and commissioning procedures and is supporting the commissioning management on site.

Renewable energy: Naameh biogaz power plant

Lebanon : Supervision of the O&M of Naameh biogaz power plant in Lebanon

EDF provides services consisting of supervising the operation and maintenance of this 7 gas engine plants on behalf of the Council for Development and Reconstruction (CDR). This supervision will allow CDR to ensure the good condition of the installations when transferring them to Électricité du Liban at the end of the O&M contract.

EDF UAE: Zouk and Jiyeh power plants

Supervision of the O&M of Zouk and Jiyeh reciprocating engines power plant

This contract consists of the supervision and management of the delegated management of the Operation and Maintenance of 2 reciprocating engines power plants on Zouk (200MW) and Jiyeh (80MW) sites in Lebanon.

Combined cycle thermal power plant Lebanon

Due diligence for the O&M of Zahrani and Deir Amar Combined Cycle Gas Turbines (CCGTs) in Lebanon

Deir Amar and Zahrani Combined Cycle Gas Turbines power plants have a total capacity of 450MW each, located in Lebanon. EDF has carried out a full due diligence study in accordance with relevant international standards and best utility practices. The final report of this due diligence aimed to be integrated by Electricity of Lebanon (EDL), the client, in the documents related to the Operation and Maintenance of the two combined cycle power plants for the future tender to be floated to outsource this O&M.